Skip to page content
Power & PoliticsUnited States edition
Sections
Only your five-digit ZIP code is sent. We never ask for your address.
Independent · nonpartisan
Rulings in this case over time

Britt Construction v. Magazzine Clean, LLC

No. 051004 · Supreme Court of Virginia. Each entry below is the court's own record, with its date and a link. This page does not say which side is ahead or what an entry means.

Full case fileRecent outcomes in this court

Rulings in this case over time

Courts at different levels and stages can reach different results in the same case. Each entry is the court's own record; read it before drawing a conclusion.

1 entry, oldest first.

  1. · Supreme Court of Virginia

    Affirmed

    The court's record, as written

    051004 Britt Construction v. Magazzine Clean, LLC 01/13/2006 Code § 43-4 requires a general contractor, as a condition of perfecting a mechanic's lien, to contemporaneously file with the memorandum of lien a "certification" that a copy of the memorandum has been mailed to the property owner. Therefore, the circuit court correctly held that 12 mechanic's liens filed by a general contractor were invalid, and properly released a construction project owner's property therefrom, where the general contractor failed to contemporaneously file certifications of mailing along with the memoranda of liens. The judgment of the circuit court is affirmed.

    Outcome words in this text: affirmed.

Method: an entry is marked with an outcome only when its own text contains the outcome word, and the word is shown beside it. Orders, opinions and judgments whose text does not say are marked Other. Party filings, notices and routine procedural orders (appearances, extra pages, time extensions, scheduling) are not listed. No link between this case and any other case is recorded in our data, so only this case's own record is shown. Open the court's docket