Blake Constr. v. Upper Occoquan Sewage Auth.
No. 022075 · Supreme Court of Virginia. Each entry below is the court's own record, with its date and a link. This page does not say which side is ahead or what an entry means.
Rulings in this case over time
Courts at different levels and stages can reach different results in the same case. Each entry is the court's own record; read it before drawing a conclusion.
1 entry, oldest first.
· Supreme Court of Virginia
ReversedAffirmedRemandedDismissed
The court's record, as written
022075 Blake Constr. v. Upper Occoquan Sewage Auth. 10/31/2003 In litigation arising from a construction contract with a public body, the trial court erred in sustaining the public body's demurrer to the plaintiff's claim that certain provisions of the contract were unenforceable and void as against public policy under Code § 2.2-4335(A). The trial court correctly dismissed plaintiff's claim for damages under a particular work order for failure to give a timely notice of claim. The judgment is affirmed in part and reversed in part, and the case is remanded. (Revised 11/13/03)
Outcome words in this text: dismissed, affirmed, reversed, remanded.
Method: an entry is marked with an outcome only when its own text contains the outcome word, and the word is shown beside it. Orders, opinions and judgments whose text does not say are marked Other. Party filings, notices and routine procedural orders (appearances, extra pages, time extensions, scheduling) are not listed. No link between this case and any other case is recorded in our data, so only this case's own record is shown. Open the court's docket
